Bourbonnais Parkway/6000N & I-57 New Interchange Construction

Illinois Department of Transportation, District 3

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Bourbonnais Pkwy/6000N & I-57 New Interchange Construction

Hutchison Engineering, Inc. was selected by Illinois Department of Transportation, District #3 to assist in the construction observation of the Bourbonnais Parkway/6000N and I -57 interchange project. This project was a $63 million contract that consisted of the construction of a new diamond interchange for 6000N Rd and I-57, which included replacement and widening of the existing structure carrying 6000N over I-57, I-57 ramp construction, widening 6000N and intersection improvements at US 45/52 and IL 50. In addition, new roadway and interchange lighting and traffic signals, utilizing LED lighting were installed. This is the first interchange within the State of Illinois to utilize LED lighting in lieu of high-pressure sodium lighting. Other major improvements within the project include storm sewer installation, construction of single and multi-span box culverts at multiple locations, construction of a shared use path and sidewalk, embankment, curb and gutter and landscape restoration. HEI provided assistance to the IDOT Resident Engineer with documentation and contractor oversight.

Construction Inspection Services

  • Construction Observation/Inspection
  • Materials Testing
  • Plan Constructability Reviews
  • Issue Resolution
  • Process Pay Requests
  • NPDES Erosion Control Inspection
  • Freeway Corridor Management
  • Quantity and Material Documentation
By Sterling, Illinois June 25, 2026
IL 40 Reconstruction
By Henry & Rock Island County, Illinois June 25, 2026
Interstate Route 80 Resurfacing and Reconstruction
By Galena, Illinois June 25, 2026
US 20 Reconstruction
By Monmouth, Illinois June 25, 2026
Monmouths Downtown Square Reconstruction/Streetscape
By East Moline, Illinois June 25, 2026
Greater Downtown Reconstruction/Streetscape
By Peoria, Illinois June 25, 2026
Wisconsin Avenue Reconstruction
By Peoria, Illinois June 25, 2026
Glen Avenue Reconstruction
By Washington, Illinois June 25, 2026
Hilldale Avenue Reconstruction
By Washington, Illinois June 25, 2026
Nofsinger Road Realignment
By Bloomington, Illinois June 10, 2026
Hamilton Road Extension
Show More
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Bourbonnais Pkwy/6000N & I-57 New Interchange Construction

HEI was selected by Illinois Department of Transportation, District 3 to assist in the construction observation of the Bourbonnais Parkway/6000N and I -57 interchange project. This project was a $63 million contract that consisted of the construction of a new diamond interchange for 6000N Road and I-57, which included replacement and widening of the existing structure carrying 6000N over I-57, I-57 ramp construction, widening 6000N and intersection improvements at US 45/52 and IL 50. In addition, new roadway and interchange lighting and traffic signals, utilizing LED lighting were installed. This is the first interchange within the State of Illinois to utilize LED lighting in lieu of high-pressure sodium lighting. Other major improvements within the project include storm sewer installation, construction of single and multi-span box culverts at multiple locations, construction of a shared use path and sidewalk, embankment, curb and gutter and landscape restoration. HEI aided the IDOT Resident Engineer with documentation and contractor oversight.

Construction Inspection Services

  • Construction Observation/Inspection
  • Materials Testing
  • Plan Constructability Reviews
  • Issue Resolution
  • Process Pay Requests
  • NPDES Erosion Control Inspection
  • Freeway Corridor Management
  • Quantity and Material Documentation
By Sterling, Illinois June 25, 2026
IL 40 Reconstruction
By Henry & Rock Island County, Illinois June 25, 2026
Interstate Route 80 Resurfacing and Reconstruction
By Galena, Illinois June 25, 2026
US 20 Reconstruction
By Monmouth, Illinois June 25, 2026
Monmouths Downtown Square Reconstruction/Streetscape
By East Moline, Illinois June 25, 2026
Greater Downtown Reconstruction/Streetscape
By Peoria, Illinois June 25, 2026
Wisconsin Avenue Reconstruction
By Peoria, Illinois June 25, 2026
Glen Avenue Reconstruction
By Washington, Illinois June 25, 2026
Hilldale Avenue Reconstruction
By Washington, Illinois June 25, 2026
Nofsinger Road Realignment
By Bloomington, Illinois June 10, 2026
Hamilton Road Extension
Show More